WYDOT will host public meeting on Snake River bridge project

October 14, 2019

Snake-River-Bridge.jpgThe Wyoming Department of Transportation will be hosting a second public meeting on the Snake River bridge replacement and intersection project on Thursday, Oct. 17 from 5 p.m. to 7 p.m. at the SpringHill Suites Conference Room at 150 W Simpson Ave. in Jackson.  

The purpose of the meeting is to present the results of a transit review, initiated by WYDOT.  The purpose of the review was to identify what transit improvements, if any, should be considered in this project.

Information and updates on the project will also be available from 5 p.m.  to 5:30 p.m. in an open house style format. The presentation on the transit study will take place at 5:30 p.m.

Information will be available on the project design and public involvement process. For more information on the project, or to take a look at the draft transit review, please visit www.dot.state.wy.us/snakeriver. 
 
WYDOT would like to remind drivers to slow down in work zones, be alert and cautious of roadside workers and obey all traffic control devices. For more information on road construction, closures and weather conditions, please visit WYDOT's 511 website.

For more information about this project contact, Stephanie Harsha, WYDOT Public Involvement, at (307) 352-3065.